Western Plains Resources has struck a $45 million deal for Chinese steel group Wuhan Iron & Steel (WISCO) to earn a 50 per cent interest in its Hawks Nest magnetite deposits near Coober Pedy in South Australia.
WISCO has agreed to sole fund a minimum commitment of $25 million to earn the half-share, with the funds earmarked for a bankable feasibility study into the development of Hawks Nest, potentially the producer of 10 million tonnes of magnetite concentrates a year.
If additional exploration or feasibility study work is required, or if the parties agree to commit to project development without further exploration or feasibility studies, WISCO will sole fund the next $20 million without increasing its half-share of the project.
The deal has been structured in a way to ease the task of securing clearance from the Foreign Investment Review Board and the Defence Department, with the latter required because Hawks Nest sits on the Woomera rocket range.
Western Plains must always hold at least 50 per cent of the project.
Source: Melbourne Age
Monday, May 4, 2009
Gold Is Georgia's Top Export Earner
In the first quarter of 2009, unprocessed and semi-processed gold moved to the leading position in the list of ten top export items of Georgia with an 11.2% share, the Department of Statistics said.
Unprocessed and semi-processed gold products worth USD 24.56m were exported from Georgia from January-March 2009, up 29.73% compared to the same period last year.
In the reported period, the export of nitrogen fertilizers decreased to USD 19.9m from USD 33.5m. The item ranks second in the list with a 9.1% share. During this year’s first quarter, the export of filbert and nuts increased by 77% to USD 16.76m and the product's share in total exports increased to 7.6% from 2.9%.
The export of motorcars in the first quarter decreased by USD 10m to USD 16.687m and the item's share in total exports stands at 7.6%. Ferro alloys, which lost a leading position in the list in January 2009, ranks fifth with a 6.9% share. Ferro alloys worth USD 15.26m was exported from Georgia during the period, compared to USD 57.64m in the first quarter of 2008. The export of metal scrap iron in January-March 2009 fell to USD 14.06m compared to USD 22.2m in the same period of 2008. The product's share in total exports fell to 6.8% from 7.3%. The export of ethyl alcohol and other spirits increased to USD 13.483m compared to USD 9.72m last year.
The export of copper ore and concentrates significantly decreased to USD 9.68m and the product's share fell to 4.4% from 10%.
Cement exports almost halved in the reported period compared to last year and totalled USD 7.71m. In January-March 2009, the export of wines totaled USD 5.88m, down by USD 1m compared to last year.
In general, from January-March 2009, exports decreased by 33.2% compared to the same period in 2008, and totaled USD 220.1m. In the reported period, imports also decreased by 30.1% and made up USD 982.1m.
Georgia's foreign trade turnover in January-March 2009 totaled USD 1.2b, down 30.7% compared to last year.
Source: Georgia Business Week
Unprocessed and semi-processed gold products worth USD 24.56m were exported from Georgia from January-March 2009, up 29.73% compared to the same period last year.
In the reported period, the export of nitrogen fertilizers decreased to USD 19.9m from USD 33.5m. The item ranks second in the list with a 9.1% share. During this year’s first quarter, the export of filbert and nuts increased by 77% to USD 16.76m and the product's share in total exports increased to 7.6% from 2.9%.
The export of motorcars in the first quarter decreased by USD 10m to USD 16.687m and the item's share in total exports stands at 7.6%. Ferro alloys, which lost a leading position in the list in January 2009, ranks fifth with a 6.9% share. Ferro alloys worth USD 15.26m was exported from Georgia during the period, compared to USD 57.64m in the first quarter of 2008. The export of metal scrap iron in January-March 2009 fell to USD 14.06m compared to USD 22.2m in the same period of 2008. The product's share in total exports fell to 6.8% from 7.3%. The export of ethyl alcohol and other spirits increased to USD 13.483m compared to USD 9.72m last year.
The export of copper ore and concentrates significantly decreased to USD 9.68m and the product's share fell to 4.4% from 10%.
Cement exports almost halved in the reported period compared to last year and totalled USD 7.71m. In January-March 2009, the export of wines totaled USD 5.88m, down by USD 1m compared to last year.
In general, from January-March 2009, exports decreased by 33.2% compared to the same period in 2008, and totaled USD 220.1m. In the reported period, imports also decreased by 30.1% and made up USD 982.1m.
Georgia's foreign trade turnover in January-March 2009 totaled USD 1.2b, down 30.7% compared to last year.
Source: Georgia Business Week
Port Hedland Exports Down 14 Per Cent In April
Port Hedland, used by BHP Billiton Ltd. and Fortescue Metals Group Ltd. to ship iron ore from Australia, said exports fell 14 percent in April.
Shipments were 11.3 million metric tons in April, down from 13.1 million tons in March, according to the port’s Web site. That compares with 10.6 million tons in April last year.
There were 67 vessels arrived at the port in April, compared with 78 in March, it said.
Source: Bloomberg
Shipments were 11.3 million metric tons in April, down from 13.1 million tons in March, according to the port’s Web site. That compares with 10.6 million tons in April last year.
There were 67 vessels arrived at the port in April, compared with 78 in March, it said.
Source: Bloomberg
China's Iron Ore Stocks Down Slightly Last Week
Iron ore stocks at China's major ports slid marginally to 74.52 million tonnes in the week to May 1, Chinica Shipbrokers Ltd said in a report, but massive imports
continued to choke two of the country's largest hubs.
Iron stocks at China's two largest iron ore ports, based in the eastern province of Shandong, have been around or above their stock capacities for the past months, despite stocks falling by 300,000 tonnes in Rizhao.
China's iron ore appetite has been boosted in the past several years, as the world's largest steel making country saw rampant growth in capacity fuelled by an economic boom that ran out of steam.
China's Shougang Group, parent of Shougang Iron and Steel and China's sixth-largest steel maker, will open its new steel mill, which has a design capacity of 4.85 million tonnes a year, in late May. Late last month, Angang Steel Co Ltd, another
flagship mill in China, started production in a new blast furnace that will add more than 3 million tonnes of pig iron ore production to the company.
The country's central government vowed on Monday to further downsize its steel capacities as massive oversupply raised challenges during the ongoing global financial crisis that has slashed demand for industrial products.
Here is a table of iron ore stocks as of May 1:
MAY 1 74.52 million tonnes (mt) (-171,000) (-0.2% on week)
APRIL 24 74.69mt (-704,000) (+1%)
APRIL 17 73.98mt (+1,534,000) (+2%)
APRIL 10 72.45mt (-100,000) (-0.1%)
APRIL 3 72.55mt (+1,033,000) (+1%)
MARCH 27 71.52mt (+1,980,000) (+3%)
MARCH 20 69.54mt (+1,053,000) (+2%)
MARCH 13 64.52mt (+1,994,000) (+3%)
MARCH 6 62.53mt (+3,397,000) (+6%)
FEB 27 59.13mt (+827,000) (+1%)
FEB 19 58.30mt (+174,000) (+0.3%)
FEB 13 58.13mt (-2,028,000) (-3%)
FEB 6 60.16mt (-210,000) (+0.4%)
JAN 23 59.95mt (-1,214,000) (-2%)
JAN 16 61.16mt (-648,000) (-1%)
JAN 9 61.81mt (-812,000) (-1%)
DEC 26 62.62mt (+310,000) (+0.5%)
Source: Reuters
continued to choke two of the country's largest hubs.
Iron stocks at China's two largest iron ore ports, based in the eastern province of Shandong, have been around or above their stock capacities for the past months, despite stocks falling by 300,000 tonnes in Rizhao.
China's iron ore appetite has been boosted in the past several years, as the world's largest steel making country saw rampant growth in capacity fuelled by an economic boom that ran out of steam.
China's Shougang Group, parent of Shougang Iron and Steel and China's sixth-largest steel maker, will open its new steel mill, which has a design capacity of 4.85 million tonnes a year, in late May. Late last month, Angang Steel Co Ltd, another
flagship mill in China, started production in a new blast furnace that will add more than 3 million tonnes of pig iron ore production to the company.
The country's central government vowed on Monday to further downsize its steel capacities as massive oversupply raised challenges during the ongoing global financial crisis that has slashed demand for industrial products.
Here is a table of iron ore stocks as of May 1:
MAY 1 74.52 million tonnes (mt) (-171,000) (-0.2% on week)
APRIL 24 74.69mt (-704,000) (+1%)
APRIL 17 73.98mt (+1,534,000) (+2%)
APRIL 10 72.45mt (-100,000) (-0.1%)
APRIL 3 72.55mt (+1,033,000) (+1%)
MARCH 27 71.52mt (+1,980,000) (+3%)
MARCH 20 69.54mt (+1,053,000) (+2%)
MARCH 13 64.52mt (+1,994,000) (+3%)
MARCH 6 62.53mt (+3,397,000) (+6%)
FEB 27 59.13mt (+827,000) (+1%)
FEB 19 58.30mt (+174,000) (+0.3%)
FEB 13 58.13mt (-2,028,000) (-3%)
FEB 6 60.16mt (-210,000) (+0.4%)
JAN 23 59.95mt (-1,214,000) (-2%)
JAN 16 61.16mt (-648,000) (-1%)
JAN 9 61.81mt (-812,000) (-1%)
DEC 26 62.62mt (+310,000) (+0.5%)
Source: Reuters
Sunday, May 3, 2009
IMF Approves Zambia Financing Package
The International Monetary Fund (IMF) has approved a $256.4 million financing package for Zambia and released $160.1 million to help the country overcome effects of the global financial crisis, a Treasury spokesman said.
Chileshe Kandeta said the IMF's executive board had approved the new facility on Friday after a review of the mineral-rich southern African country's economy.
"The IMF executive board (has) approved an increase in financial support under the poverty reduction growth facility (PRGF) by $256.4 million to $329.7 million to help Zambia cope with the global economic slowdown and financial crisis," Kandeta said in a statement released late on Saturday.
Kandeta said the completion of the combined reviews allowed for the immediate release of $160.1 million, bringing the total disbursements to Zambia to $170.6 million.
IMF Deputy Managing Director Takatoshi Kato said in the same statement that Zambia's PRGF programme implementation and recent economic performance had been hurt by higher international food and fuel prices, pushing inflation above the programme's target.
Zambia's annual inflation was recorded at 14.3 percent in April, up from 13.1 percent the previous month.
Kato said a steep fall in global copper prices had also hit exports and government revenue in the copper-rich nation. "The volatility of the kwacha (currency) underscores the need to reduce Zambia's vulnerability to fluctuations in copper prices through continued vigorous implementation of structural reforms to diversify the economy," Kato said.
The Zambian kwacha depreciated to 5,775/dollar at close of business on Friday from an average of 3,000 kwacha to a dollar in May 2008.
The initial IMF $79.2 million PRGF lending facility was approved in June to support Zambia's economic policies aimed at alleviating poverty and sustaining growth.
In 2006, the IMF, the World Bank and other African and Western lenders cut Zambia's debt to $502 million from $7.1 billion under global plans to cut debts of some of the world's poorest countries.
Source: The Guardian
Chileshe Kandeta said the IMF's executive board had approved the new facility on Friday after a review of the mineral-rich southern African country's economy.
"The IMF executive board (has) approved an increase in financial support under the poverty reduction growth facility (PRGF) by $256.4 million to $329.7 million to help Zambia cope with the global economic slowdown and financial crisis," Kandeta said in a statement released late on Saturday.
Kandeta said the completion of the combined reviews allowed for the immediate release of $160.1 million, bringing the total disbursements to Zambia to $170.6 million.
IMF Deputy Managing Director Takatoshi Kato said in the same statement that Zambia's PRGF programme implementation and recent economic performance had been hurt by higher international food and fuel prices, pushing inflation above the programme's target.
Zambia's annual inflation was recorded at 14.3 percent in April, up from 13.1 percent the previous month.
Kato said a steep fall in global copper prices had also hit exports and government revenue in the copper-rich nation. "The volatility of the kwacha (currency) underscores the need to reduce Zambia's vulnerability to fluctuations in copper prices through continued vigorous implementation of structural reforms to diversify the economy," Kato said.
The Zambian kwacha depreciated to 5,775/dollar at close of business on Friday from an average of 3,000 kwacha to a dollar in May 2008.
The initial IMF $79.2 million PRGF lending facility was approved in June to support Zambia's economic policies aimed at alleviating poverty and sustaining growth.
In 2006, the IMF, the World Bank and other African and Western lenders cut Zambia's debt to $502 million from $7.1 billion under global plans to cut debts of some of the world's poorest countries.
Source: The Guardian
China HRC Price Rise
Chinese domestic hot rolled steel coil prices have risen steadily this week. The prices increased some CNY 60 per tonne after the first day's CNY 8 per tonne drop. In the export and import market, the quiet performance remains unchanged and only few deals are seen. Most of the products that arrived this week were mainly contracts signed earlier.
Taking the Shanghai price for commercial 4.75mm to 12mm*1500mm HRC as a benchmark, the price is expected to remain weak if it remains below CNY 4000 per tonne. But the short term outlook looks bright and the price is expected to see an increase of CNY 100 to 200 per tonne as many new projects are starting to kick off and demand is gradually warming up.
The import market continued its soft performance this week with almost no offers in the market, while in the international market, the CIS has hiked its May delivered resources by USD 40 per tonne with the price posted at USD 350 per tonne to USD 400 per tonne FOB Black Sea.
As for exports, the market remains sluggish and the price posted at USD 460 to 480 per tonne, however, it is said one Chinese steel mill has signed a deal to deliver 12,000 tons of HRC to South Korea in May with the price of USD 439 per tonne.
Source: Steel Guru
Taking the Shanghai price for commercial 4.75mm to 12mm*1500mm HRC as a benchmark, the price is expected to remain weak if it remains below CNY 4000 per tonne. But the short term outlook looks bright and the price is expected to see an increase of CNY 100 to 200 per tonne as many new projects are starting to kick off and demand is gradually warming up.
The import market continued its soft performance this week with almost no offers in the market, while in the international market, the CIS has hiked its May delivered resources by USD 40 per tonne with the price posted at USD 350 per tonne to USD 400 per tonne FOB Black Sea.
As for exports, the market remains sluggish and the price posted at USD 460 to 480 per tonne, however, it is said one Chinese steel mill has signed a deal to deliver 12,000 tons of HRC to South Korea in May with the price of USD 439 per tonne.
Source: Steel Guru
Orissa Government Reserves More Iron Ore Field For POSCO
Besides recommending a prospecting license (PL) for over 25 sq km of iron ore field at Khandadhar in favour of Posco India, the Orissa government has decided to keep another 35 sq km of reserve for the future needs of the South Korean steel major, official sources have said.
With regards to the additional area of approximately 35 sq km available in the Khandadhar iron ore reserve in Sundargarh district, the state government has decided to keep it with its own reach so that it could meet the commitment of supplying 600 million tonnes of iron ore to Posco India, a recent order signed by chief minister Naveen Patnaik said.
The state government, which committed through an MoU to supply 600 million tonnes of iron ore to the South Korean giant for its proposed 12 MTPA capacity Greenfield project near Paradip, had recommended only 2500 acres of iron ore field for PL in January this year.
Though earlier, the state government had recommended 6204.325 hectares of iron ore field for PL in favour of Posco in December, 2006, it preferred to squeeze the area on its latest recommendation to the Central government.
The state government's recommendation made in 2006, was rejected by the Centre in the wake of a litigation in the Orissa High Court.
The state government, which finally made a fresh recommendation in favour of Posco in January 2009, decided to allot less area in comparison to the previous recommendation, steel and mines minister Pradip Amat informed.
The state government's decision to keep more iron ore deposits with an intention of meeting Posco's future demands, however, sparked a controversy as the chief minister, chief secretary Ajit Kumar Tripathy, Amat and steel and mines secretary Ashok Dalwai signed on the order sheet in the month of April when the model code of conduct was in force.
When Amat, Tripathy and Dalwai signed the document before the first phase of polling on April 16, the chief minister put his signature on April 19, the date in between the two phases of polling. Claiming that it was not a violation of the model code of conduct for the elections, Amat said it was an ongoing process.
"We have not signed in any new file. PL to Posco and related matter was in process since the company signed MoU with the state government on June 22, 2005", he pointed out. This apart, the minister said that the state government signed the document as it was supposed to comply with an order of the Orissa High Court.
Source: Orissa Diary
With regards to the additional area of approximately 35 sq km available in the Khandadhar iron ore reserve in Sundargarh district, the state government has decided to keep it with its own reach so that it could meet the commitment of supplying 600 million tonnes of iron ore to Posco India, a recent order signed by chief minister Naveen Patnaik said.
The state government, which committed through an MoU to supply 600 million tonnes of iron ore to the South Korean giant for its proposed 12 MTPA capacity Greenfield project near Paradip, had recommended only 2500 acres of iron ore field for PL in January this year.
Though earlier, the state government had recommended 6204.325 hectares of iron ore field for PL in favour of Posco in December, 2006, it preferred to squeeze the area on its latest recommendation to the Central government.
The state government's recommendation made in 2006, was rejected by the Centre in the wake of a litigation in the Orissa High Court.
The state government, which finally made a fresh recommendation in favour of Posco in January 2009, decided to allot less area in comparison to the previous recommendation, steel and mines minister Pradip Amat informed.
The state government's decision to keep more iron ore deposits with an intention of meeting Posco's future demands, however, sparked a controversy as the chief minister, chief secretary Ajit Kumar Tripathy, Amat and steel and mines secretary Ashok Dalwai signed on the order sheet in the month of April when the model code of conduct was in force.
When Amat, Tripathy and Dalwai signed the document before the first phase of polling on April 16, the chief minister put his signature on April 19, the date in between the two phases of polling. Claiming that it was not a violation of the model code of conduct for the elections, Amat said it was an ongoing process.
"We have not signed in any new file. PL to Posco and related matter was in process since the company signed MoU with the state government on June 22, 2005", he pointed out. This apart, the minister said that the state government signed the document as it was supposed to comply with an order of the Orissa High Court.
Source: Orissa Diary
Copper Hits Highest Level For Two Weeks
Copper shot to its highest level in two weeks on Friday, buoyed by a weak dollar, tightening supplies and upbeat economic data that offered evidence of a potential recovery in the global economy.
A surprisingly strong improvement in U.S. consumer confidence in April and a less severe contraction in the nation's manufacturing sector offered bullish investors some reassurances about the outlook for the global economy.
"To me, it all suggests that the stars are starting to align for a global recovery," said Bart Melek, Global Commodity Strategist with BMO Nesbitt Burns in Toronto.
"We certainly look like we are bottoming," he said, adding that the U.S. economy may experience positive growth by as early as the third quarter.
Copper for July delivery on the New York Mercantile Exchange's COMEX division rallied 5.35 cents, or 2.6 percent, to settle at $2.1010 a lb, its highest level on a closing basis since April 20.
"The ISM data that came out was much better than expected, especially the new orders component, strongest since August 2008," said Jesper Dannesboe, senior commodities strategist Societe Generale.
"The manufacturing data gave the market a real boost in the afternoon,." he added.
Copper for three month delivery on the London Metal Exchange (LME) closed up $169 at $4,600 a tonne.
The metal used in power and construction rose about 9 percent in April.
But analysts warned of gains looked fragile as recent support from buying by the Chinese State Reserves Bureau (SRB) would likely subside in coming months.
"Assuming that the SRB buying slows down or dries up, then the fundamentals of oversupply are going to reassert themselves and therefore the copper price is going to weaken," said Charles Kernot, a mining analyst at Evolution Securities.
A surge in canceled warrants has supported copper this year, with the market believing the majority of the material tagged for delivery has been heading for China, the world's biggest copper consumer.
Canceled warrants were 83,100 tonnes from 84,000 tonnes the day before, accounting for about 20 percent of total LME inventories, which fell 7,075 tonnes to 398,700 tonnes.
Stocks have dropped by about 25 percent, or around 140,000 tonnes, since late February.
Copper moved into a contango - a discount on cash over three-month contracts - an atypical move in a bullish market and bucking this week's trend of backwardation.
Spreads on copper widened to a $3 discount on cash over three months contracts as traders cited market tightness easing.
Zinc jumped more than 6 percent and closed at $1,510 a tonne following the U.S. data, from $1,425.
Battery material lead closed at $1,400 from $1,331.
Chinese manufacturing gained further momentum last month, a survey of executives in charge of purchasing in industries across China showed on Friday.
It added to tentative evidence from around the world that the global economy may soon be on the path to recovery.
"The PMI data has helped give a booster from the macro side but more metals specific is the draws in inventory helping to build a more positive underlying picture for the metals," said Gayle Berry, an analyst at Barclays Capital.
Aluminum gained to close at $1,537 a tonne from $1,494 the day before. LME stocks for the metal, used in the autos and packaging industries, jumped 6,075 tonnes to a record 3.79 million tonnes.
Source: Reuters/Maktoob Business
A surprisingly strong improvement in U.S. consumer confidence in April and a less severe contraction in the nation's manufacturing sector offered bullish investors some reassurances about the outlook for the global economy.
"To me, it all suggests that the stars are starting to align for a global recovery," said Bart Melek, Global Commodity Strategist with BMO Nesbitt Burns in Toronto.
"We certainly look like we are bottoming," he said, adding that the U.S. economy may experience positive growth by as early as the third quarter.
Copper for July delivery on the New York Mercantile Exchange's COMEX division rallied 5.35 cents, or 2.6 percent, to settle at $2.1010 a lb, its highest level on a closing basis since April 20.
"The ISM data that came out was much better than expected, especially the new orders component, strongest since August 2008," said Jesper Dannesboe, senior commodities strategist Societe Generale.
"The manufacturing data gave the market a real boost in the afternoon,." he added.
Copper for three month delivery on the London Metal Exchange (LME) closed up $169 at $4,600 a tonne.
The metal used in power and construction rose about 9 percent in April.
But analysts warned of gains looked fragile as recent support from buying by the Chinese State Reserves Bureau (SRB) would likely subside in coming months.
"Assuming that the SRB buying slows down or dries up, then the fundamentals of oversupply are going to reassert themselves and therefore the copper price is going to weaken," said Charles Kernot, a mining analyst at Evolution Securities.
A surge in canceled warrants has supported copper this year, with the market believing the majority of the material tagged for delivery has been heading for China, the world's biggest copper consumer.
Canceled warrants were 83,100 tonnes from 84,000 tonnes the day before, accounting for about 20 percent of total LME inventories, which fell 7,075 tonnes to 398,700 tonnes.
Stocks have dropped by about 25 percent, or around 140,000 tonnes, since late February.
Copper moved into a contango - a discount on cash over three-month contracts - an atypical move in a bullish market and bucking this week's trend of backwardation.
Spreads on copper widened to a $3 discount on cash over three months contracts as traders cited market tightness easing.
Zinc jumped more than 6 percent and closed at $1,510 a tonne following the U.S. data, from $1,425.
Battery material lead closed at $1,400 from $1,331.
Chinese manufacturing gained further momentum last month, a survey of executives in charge of purchasing in industries across China showed on Friday.
It added to tentative evidence from around the world that the global economy may soon be on the path to recovery.
"The PMI data has helped give a booster from the macro side but more metals specific is the draws in inventory helping to build a more positive underlying picture for the metals," said Gayle Berry, an analyst at Barclays Capital.
Aluminum gained to close at $1,537 a tonne from $1,494 the day before. LME stocks for the metal, used in the autos and packaging industries, jumped 6,075 tonnes to a record 3.79 million tonnes.
Source: Reuters/Maktoob Business
Saturday, May 2, 2009
Ferroatlantica To Build Silicon Metal Plant In Tibet
Spanish company, Grupo Villar Mir, has signed an agreement with Sichuan Kangding Tibetan Autonomous Prefecture government on April 29th for Grupo Villar Mir's subsidiary, Ferroatlantica, will invest EUR820 million to build the world's largest silicon metal plant in Kangding Tibetan Autonomous Prefecture, Sichuan, in southwest China.
Mr Juan Miguel Villar Mir, president of Grupo Villar Mir, said the plant will commence construction in this September and finish in 2013. It will churn out 100,000 tonnes of chemical grade silicon metal and 50,000 tonnes of Solar Grade Silicon each year when it is on stream.
Mr Mir added that this new plant is designed with the most advanced technology, and all the solid, liquid and gaseous products will be transported by seal pipe, so the plant will not pollute the atmosphere and the environment.
Ferroatlantica Company is the largest silicon metal producer in the world.
Source: Steel Guru
Mr Juan Miguel Villar Mir, president of Grupo Villar Mir, said the plant will commence construction in this September and finish in 2013. It will churn out 100,000 tonnes of chemical grade silicon metal and 50,000 tonnes of Solar Grade Silicon each year when it is on stream.
Mr Mir added that this new plant is designed with the most advanced technology, and all the solid, liquid and gaseous products will be transported by seal pipe, so the plant will not pollute the atmosphere and the environment.
Ferroatlantica Company is the largest silicon metal producer in the world.
Source: Steel Guru
Friday, May 1, 2009
Tata To Restructure Corus Operations
The global slump in steel prices and demand has prompted Tata Steel to consider restructuring the continental European operations of Corus, the Anglo-Dutch steel major it acquired in 2007 for $12 billion.
The focus of the review is Corus’ plants in Spain, France and the Netherlands, which could include selling these units if the need arises. Tata Steel's consolidated profits fell 48 per cent to Rs 732 crore in the quarter ended December, after Corus faced a drop in sales (the company does not give Corus' results separately).
Corus, which has an annual production capacity of 20 million tonnes, has plants in the UK, the Netherlands, Germany, France and Belgium.
This week, the company suffered a setback after an Italian buyer, Marcegaglia, backed out from a deal to buy its Teesside plant in northern England, saying the $480 million deal would financially stretch the company.
An e-mail sent to the company spokesperson on Wednesday did not elicit a response.
To limit losses, Corus has already decided to divest in downstream businesses. Briand Investments, an affiliate of UK-based investment group Klesch, had agreed to acquire Corus' aluminium smelters at Voerde in Germany and Delfzijl in the Netherlands.
The company has also closed the three service centres in the UK. As part of restructuring its building systems division, it has closed units in south Wales and relocated the facilities to Shotton in north-east England.
Tata Steel, which has about $9 billion debt in its books, is also looking to roll over the $4 billion of debt it raised to buy Corus. Sources said the company planned to extend the loan repayment period for three years to help Corus weather the downturn. Tata Steel has to repay $795 million in 2009-10 and $1.3 billion in 2010-11; however, the company is free from repayment until December 2009.
“The company may use part its $1.9 billion reserves for the loan repayment, but that will adversely affect its expansion plans in India. The company requires $1.2 billion for its capital expenditure during this fiscal,” said a Mumbai-based analyst.
Corus, the analyst added, has already cut 40 per cent of its production after the demand slump, so cash flows from Europe also will be lower. “The restricted cash flow will affect Corus' plans to acquire iron ore and coking coal mines for raw material security,” said a Mumbai-based analyst.
The Tata Steel and Corus managements have already gone through some top-level changes after Philippe Varin resigned as chief executive to head French car maker PSA Peugeot Citroen. Kirby Adams, former chief executive of BlueScope Steel in Australia, has succeeded Varin.
Source: Business Standard
The focus of the review is Corus’ plants in Spain, France and the Netherlands, which could include selling these units if the need arises. Tata Steel's consolidated profits fell 48 per cent to Rs 732 crore in the quarter ended December, after Corus faced a drop in sales (the company does not give Corus' results separately).
Corus, which has an annual production capacity of 20 million tonnes, has plants in the UK, the Netherlands, Germany, France and Belgium.
This week, the company suffered a setback after an Italian buyer, Marcegaglia, backed out from a deal to buy its Teesside plant in northern England, saying the $480 million deal would financially stretch the company.
An e-mail sent to the company spokesperson on Wednesday did not elicit a response.
To limit losses, Corus has already decided to divest in downstream businesses. Briand Investments, an affiliate of UK-based investment group Klesch, had agreed to acquire Corus' aluminium smelters at Voerde in Germany and Delfzijl in the Netherlands.
The company has also closed the three service centres in the UK. As part of restructuring its building systems division, it has closed units in south Wales and relocated the facilities to Shotton in north-east England.
Tata Steel, which has about $9 billion debt in its books, is also looking to roll over the $4 billion of debt it raised to buy Corus. Sources said the company planned to extend the loan repayment period for three years to help Corus weather the downturn. Tata Steel has to repay $795 million in 2009-10 and $1.3 billion in 2010-11; however, the company is free from repayment until December 2009.
“The company may use part its $1.9 billion reserves for the loan repayment, but that will adversely affect its expansion plans in India. The company requires $1.2 billion for its capital expenditure during this fiscal,” said a Mumbai-based analyst.
Corus, the analyst added, has already cut 40 per cent of its production after the demand slump, so cash flows from Europe also will be lower. “The restricted cash flow will affect Corus' plans to acquire iron ore and coking coal mines for raw material security,” said a Mumbai-based analyst.
The Tata Steel and Corus managements have already gone through some top-level changes after Philippe Varin resigned as chief executive to head French car maker PSA Peugeot Citroen. Kirby Adams, former chief executive of BlueScope Steel in Australia, has succeeded Varin.
Source: Business Standard
Thor Committed To Molyhill Project
Thor Mining PLC said development of its its Molyhil tungsten molybdenum project in Australia - and, in particular, financing - still continues to be a high priority.
It also continues to investigate alternatives to reduce capital and operating costs there, the group said in a quarterly update. Financing discussions have been positive to date, however the mood is still very cautious in the current financial climate.
The selling price of molybdenum roasted concentrates has reduced slightly during the quarter to end-March and showing some signs of support at US$8 per pound. The selling price of Tungsten APT has reduced slightly to between US$210 and US$225 per metric ton unit.
Demand for the commodities has increased slightly over the period, with worldwide stockpiles nearly exhausted. Demand is showing signs of improvement for the remainder of the year, as the steel industry shows increased production levels, Thor added.
In a separate statement it announced it has appointed Daniel Stewart & Co PLC as its nominated adviser and broker.
Source: Proactive Investors
It also continues to investigate alternatives to reduce capital and operating costs there, the group said in a quarterly update. Financing discussions have been positive to date, however the mood is still very cautious in the current financial climate.
The selling price of molybdenum roasted concentrates has reduced slightly during the quarter to end-March and showing some signs of support at US$8 per pound. The selling price of Tungsten APT has reduced slightly to between US$210 and US$225 per metric ton unit.
Demand for the commodities has increased slightly over the period, with worldwide stockpiles nearly exhausted. Demand is showing signs of improvement for the remainder of the year, as the steel industry shows increased production levels, Thor added.
In a separate statement it announced it has appointed Daniel Stewart & Co PLC as its nominated adviser and broker.
Source: Proactive Investors
Rio Tinto Holds Out Against 40 Per Cent Price Cut
RioTinto, the world's second-largest producer of iron ore, is refusing to give in to steelmakers' demands for a benchmark price cut of more than 40 per cent below current spot prices for the 2009-10 contract year.
Rio executives told an analysts' briefing yesterday that the iron ore spot market had probably found a floor and any annual contract settlement needed to be at a premium to spot prices.
The company, Australia's biggest iron ore exporter, also said it has boosted its spot sales after a decision to compete with BHP Billiton in that market.
Briefing analysts in Sydney yesterday, Rio iron ore boss Sam Walsh suggested spot prices about 40 per cent below last year's contract price would not fall much lower because high-cost Chinese production had been displaced.
Rio and BHP are in contract negotiations for this year with Chinese steel mills. Talks are expected to drag on as producers wait for China's stimulus packages to boost steel demand.
Analysts are forecasting falls of 20-40 per cent from last year's record prices.
Macquarie analyst Brendan Harris said Mr Walsh indicated Rio's Pilbara operations were running at, or close to, their capacity of 200 million tonnes a year after being affected by heavy rains last quarter.
According to Mr Harris, Mr Walsh confirmed Rio was selling higher tonnages in the spot market after a decision to compete with a major producer that "acted to remove support for the benchmark price".
Merrill Lynch analyst Olivia Ker said Rio was bullish on Chinese iron ore demand, and was running at flat-out capacity.
"They also said they won't settle below spot prices," she said.
BHP has been leading a campaign to smash the annual contract system, although it is still involved in price talks.
Refusing to join Rio and Brazil's Vale in cutting production last year, BHP instead said it would sell on the spot market as long as it made a profit.
Last month, BHP revealed 28 per cent of its sales in the first nine months of the year were on spot markets as customers asked for deferrals of higher-priced contract deliveries.
Mr Walsh said China's campaign to settle below spot prices, if successful, would imperil the relevance of the benchmark system.
He also said Rio's plans to boost its Pilbara capacity by 320 million tonnes a year was at the advanced engineering and review stage and could be approved at short notice.
Source: The Australian
Rio executives told an analysts' briefing yesterday that the iron ore spot market had probably found a floor and any annual contract settlement needed to be at a premium to spot prices.
The company, Australia's biggest iron ore exporter, also said it has boosted its spot sales after a decision to compete with BHP Billiton in that market.
Briefing analysts in Sydney yesterday, Rio iron ore boss Sam Walsh suggested spot prices about 40 per cent below last year's contract price would not fall much lower because high-cost Chinese production had been displaced.
Rio and BHP are in contract negotiations for this year with Chinese steel mills. Talks are expected to drag on as producers wait for China's stimulus packages to boost steel demand.
Analysts are forecasting falls of 20-40 per cent from last year's record prices.
Macquarie analyst Brendan Harris said Mr Walsh indicated Rio's Pilbara operations were running at, or close to, their capacity of 200 million tonnes a year after being affected by heavy rains last quarter.
According to Mr Harris, Mr Walsh confirmed Rio was selling higher tonnages in the spot market after a decision to compete with a major producer that "acted to remove support for the benchmark price".
Merrill Lynch analyst Olivia Ker said Rio was bullish on Chinese iron ore demand, and was running at flat-out capacity.
"They also said they won't settle below spot prices," she said.
BHP has been leading a campaign to smash the annual contract system, although it is still involved in price talks.
Refusing to join Rio and Brazil's Vale in cutting production last year, BHP instead said it would sell on the spot market as long as it made a profit.
Last month, BHP revealed 28 per cent of its sales in the first nine months of the year were on spot markets as customers asked for deferrals of higher-priced contract deliveries.
Mr Walsh said China's campaign to settle below spot prices, if successful, would imperil the relevance of the benchmark system.
He also said Rio's plans to boost its Pilbara capacity by 320 million tonnes a year was at the advanced engineering and review stage and could be approved at short notice.
Source: The Australian
James River Coal Beats Expectations
James River Coal Co's quarterly profit has beaten expectations, boosted by a 73 percent jump in the average price of Central Appalachian coal (CAPP), but said it would adjust production volumes to keep pace with the softness in the coal market.
CAPP average sales price rose to $90.91 per ton, compared with $52.56 per ton, in the year-ago quarter because of some new contracts signed by the company.
For the first quarter, the coal producer swung to a net profit of $28.2 million, or $1.03 a share, compared with a net loss of $16.7 million, or 78 cents a share, a year earlier.
Revenue at the Richmond, Virginia-based company rose 39 percent to $192.1 million.
"In response to the weak coal markets, we are continuing to adjust our production through small changes to our work schedules for the remainder of 2009," Chief Operating Officer C.K. Lane said in a statement.
The company, whose operations are located in the Central Appalachian basin of the United States, mines and sells bituminous, steam and industrial-grade coal in Kentucky and Indiana.
Source: Reuters
CAPP average sales price rose to $90.91 per ton, compared with $52.56 per ton, in the year-ago quarter because of some new contracts signed by the company.
For the first quarter, the coal producer swung to a net profit of $28.2 million, or $1.03 a share, compared with a net loss of $16.7 million, or 78 cents a share, a year earlier.
Revenue at the Richmond, Virginia-based company rose 39 percent to $192.1 million.
"In response to the weak coal markets, we are continuing to adjust our production through small changes to our work schedules for the remainder of 2009," Chief Operating Officer C.K. Lane said in a statement.
The company, whose operations are located in the Central Appalachian basin of the United States, mines and sells bituminous, steam and industrial-grade coal in Kentucky and Indiana.
Source: Reuters
CISA- China Still Wants 40 Per Cent Price Cut
Reports from China suggest that despite high iron ore imports into China, the China Iron & Steel Association is still pursuing a cut of at least 40% in contract prices from last year's benchmark, supported by the facts that steel prices are still falling and inventory is increasing.
China imported iron ore resources of 131.5253 million tonnes in Q1 2009, up 20.8611 million tonnes or 18.85% year-on-year, and steel product outputs in this period came to 144.7289 million tonnes, up 3.9058 million tonnes or 2.77%.
Head of Vale China Mr Zhu Kai had expressed his optimism on the Chinese market saying they are further developing this market.
Insiders say the 'big three' miners have deliberately been putting off talks expecting to see a better Chinese steel market in the second and third quarters.
A Xiamen-based trader says this is consistent with their strategy. Iron ore sellers have press down the price to attract larger imports of the resource and create a 'fake surge' in demand ultimately obtaining a bigger leverage in the talks. Part of the iron ore stockpiles at seaports are being stored by ore suppliers for spot selling.
Mr Luo Bingsheng said 70 million tonnes are more than double monthly imports and a normal level of the stock should be some 30 million tonnes. The key is that Chinese demand has not risen. A surge imports will not become their bargaining chip but may instead drag down the market price as a whole. With more and more resources piling at the ports, the spot iron ore import price plunged to USD 60 per tonne by end of March.
Mr Luo affirmed that Chinese steel market will not recover for some time, which will pull back the contract price of iron ore.
Source: Steel Guru/Economics Reference
China imported iron ore resources of 131.5253 million tonnes in Q1 2009, up 20.8611 million tonnes or 18.85% year-on-year, and steel product outputs in this period came to 144.7289 million tonnes, up 3.9058 million tonnes or 2.77%.
Head of Vale China Mr Zhu Kai had expressed his optimism on the Chinese market saying they are further developing this market.
Insiders say the 'big three' miners have deliberately been putting off talks expecting to see a better Chinese steel market in the second and third quarters.
A Xiamen-based trader says this is consistent with their strategy. Iron ore sellers have press down the price to attract larger imports of the resource and create a 'fake surge' in demand ultimately obtaining a bigger leverage in the talks. Part of the iron ore stockpiles at seaports are being stored by ore suppliers for spot selling.
Mr Luo Bingsheng said 70 million tonnes are more than double monthly imports and a normal level of the stock should be some 30 million tonnes. The key is that Chinese demand has not risen. A surge imports will not become their bargaining chip but may instead drag down the market price as a whole. With more and more resources piling at the ports, the spot iron ore import price plunged to USD 60 per tonne by end of March.
Mr Luo affirmed that Chinese steel market will not recover for some time, which will pull back the contract price of iron ore.
Source: Steel Guru/Economics Reference
Zambia Pins Its Hopes On Lumwana Copper Prject
Mining Weekly
Zambia, once viewed as a Central African economic power house, wants to reclaim some of its former glory as Africa's biggest greenfield copper project, Lumwana, is commissioned.
As recently as the 1960s, Zambia was the world's biggest producer of copper but its position was usurped by Chile, about which Anglo American CEO Cynthia Carroll said in Santiago this month: "The success of Chile in establishing a stable macro-economic environment and attractive investment climate is the envy of the world."
Zambia needs to take note of that sort of comment to improve its position as an investment destination and encourage foreign direct investment (FDI) once again.
Zambia's 1964 independence saw the start of its FDI decline, which reached a crisis point in the 1990s. All the while, Chile had been allowed to streak ahead as plans to develop Zambia's mineral-rich North West province, which forms part of the renowned African Copper Belt and houses massive copper deposits, gathered dust.
The boom saw mines reopen, but now mine closure is on more investors lips than mine openers, Glencore, for one seeking to close its Nkana and Mufulira copper mines.
But the exception the Australian-led Equinox Minerals, which flew journalists to its big Lumwana copper mine opening last week.
Equinox CEO Craig Williams said at the opening that the company he cofounded came into Zambia looking for a project that would enhance its stability, and to gain a foothold into Africa.
But sobering was his comment that no fewer than ten companies had previously tried to develop the Lumwana project - which has both copper and uranium - but fell short owing to lack of funding and changes in mining policy in the country.
The Lumwana licence covers 1 355 km2 and includes two major copper deposits, Malundwe and Chimiwungo, as well as 25 exploration prospects, and comes into play when at a time when major producer Codelco foresees the 2010 copper at $1,50/lb - or $3,300/t.
Fairfax reports that the current lower copper prices are still well above production costs for many of the better quality miners.
Catalyst for Change
Zambian President Rupiah Banda made his mark at the Lumwana opening, marvelling at the irony of the Lumwana project being commissioned while the world is still suffering in the aftermath the financial meltdown.
Fairfax mining analysis service expects Lumwana to produce 172 000t of copper a year for the first five years.
"The opening of the Lumwana copper mine will be a catalyst for change in Zambia. It will be the economic turning point that the North Western province and Zambia needs to re-establish itself as a Central African economic powerhouse," Banda predicted.
But to do so, the Zambian government will have to show consistency and ongoing credibility, which has been lacking in the past.
The manner in which Zambia cut, raised and then recut its mining royalty regime turned potential investors away.
While Banda called for others to show the perseverance that Equinox has shown at Lumwana, it would be in Zambia's interests to note that its copper rival, Chile, last month received a credit upgrade from Moody's Investors Service along with a positive outlook at a time when most other countries are receiving downgrades from the same institution.
"As a nation, we need to take up a mindset of perseverance because when challenges look formidable, we can mobilise ourselves and resolutely confront our challenges in order to realise that which others think is insurmountable," said Banda.
He added that the second lesson that could be learned from the development of the project was that success does not come easily, as during the period of planning and developing the Lumwana project, a lot of money was spent on developing associated infrastructure.
"I am informed that, in the 12 years of the development of the Lumwana project, Equinox invested more than $1-billion, which included the development of a modern new town in Lumwana," said Banda
Banda praised the dedication of the former Zambian President Patrick Mwanawasa, describing the late president's commitment to the development of the project as unwavering. He assured Equinox that the current Zambian government would display similar commitment.
"The current Zambian government and the people of this country will support this investment and stand by Equinox to ensure that the Lumwana project is beneficial for all stakeholders," said Banda.
Funding Lumwana today would probably have been an extremely tough task. But Equinox began doing so in a far better capital-raising environment, and Lumwana's uranium upside assisted.
In 2006, Equinox completed three rounds of equity financing totalling $250-million through a short-form prospectus equity issue managed by an international syndicate of underwriters; a private placement equity issue to Zambia Consolidated Copper Mines Investments Holdings, managed by the company; and a second short-form prospectus equity issue, managed by an international syndicate of underwriters. Equinox also announced recently that it has agreed the restructure of its credit facilities.
The company completed a uranium feasibility study in 2008 which showed output of two million pounds a year of uranium oxide and 15 000 t of copper that could be mined simultaneously from the discrete uranium-enriched zones in the Lumwana copper pits.
In May 2008 Equinox Minerals was also able to secure a 99-year land title to 350 km2 for its township and mine operation areas.
The licence is valid for 25 years, from January 2004, and is renewable for a further 25 years.
Production from the copper plant is expected towards the end of the middle of the second quarter while commissioning of the uranium plant is targeted for 2010.
Copper wise, so much hinges on demand.
Fairfax remains cautious about fundamental demand in China being enough to absorb all additional copper imported and produced recently, but says that, if the global stimulus packages result in stronger, sustained demand then there is reason for optimism. The London investment analysts see the US stimulus package in particular as having the potential to cause American copper demand to recover.
Diversified engineering companies Bateman Engineering NV and Ausenco were responsible for the building of the process plant.
Sulphide ore will be processed on-site by conventional flotation methods to produce copper concentrates for shipment to off-site smelters.
Concentrates will then be smelted and refined into metal at smelters either in Zambia, southern Africa or offshore. Negotiations are under way with a number of regional smelters, with letters of intent having been signed with Palabora Mining Company in South Africa, Ongopolo Mining and Processing in Namibia and Mopani Copper Mines in Zambia.
Trucks from the mine will tip directly into a 400 t capacity run of mine (ROM) dump hopper. A primary gyratory crusher will be used to crush the ROM ore from a nominal top size of 1 500 mm to less than 200 mm. Oversize material will be deposited on the ROM pad to be further broken by a mobile rock breaker.
Ore will be reclaimed through apron feeders onto a conveyor belt providing direct feed, at a rate of about 2 500t/h, into the SAG mill. The SAG mill trommel undersize will discharge into a hopper and will be pumped to conventional hydrocyclones, operating in closed circuit with a 26-ft × 40-ft ball mill. The hydrocyclone overflow reports to flotation, while the underflow returns to the ball mill.
The flotation plant will consist of two parallel trains of rougher scavenger cells. The rougher scavenger concentrate will report to the regrind circuit to further liberate the copper minerals. Regrinding will be followed by a conventional cleaner and recleaner circuit to reach final concentrate grade.
The concentrate will be dewatered in a circuit consisting of high-rate thickening followed by pressure filtration to produce a filter cake suitable for transportation. Flotation tailings will be thickened and pumped to the tailings dam. Most of the plant water will be recovered and recycled from the thickener overflows and tailings dam return water. Fresh make-up water will be supplied as required from a river-water dam.
The Lumwana project is situated in Zambia's North West province, which is predominantly rural. Instead of importing mine workers from developed centres such as Kitwe and Lusaka, Equinox, in conjunction with the Lumwana Mining Company (LMC), have established a comprehensive social upliftment programme, which aims to develop the immediate area surrounding the mine as well as neighbouring Solwezi.
Former Zambian politician, now chairperson of LMC Dr Peter Matoka reported that the Lumwana social upliftment programme was unlike any in Central Africa.
"Various projects are being driven by mine bosses to build schools and libraries in Lumwana and Solwezi. Programmes are also in place to ensure that the best teachers are employed in the schools surrounding Solwezi. Ultimately, the programme wishes to encourage the advancement of literacy in the rural North Western province," says Matoka.
Government is also playing a role in the development of the area. Matoka reports that the Zambian government has made significant donations to the establishment of clinics and hospitals in the area.
And the fruits of the social upliftment programme are already starting to show; a feature of the Lumwana mine is the huge Euclid DT 50 t dump trucks that transport the crushed ore to the process plant. The majority of these trucks are operated by workers from the Solwezi district and are predominantly female.
Construction of the mine started in earnest in late 2006 and has been carried out by about 4 700 local workers, and cost about $760-million.
Matoka said that skills retention in the area is key, especially since the mine's expected to produce its first tonnages towards the end of the second quarter.
"There have been some enquiries to tap into the mine's skills base especially from mines in neighbouring countries. The majority of the enquiry's are centred on the mine's truck operators," says Matoka.
The demand for copper over the past two years has been high; this was mainly driven by demand from China and India, both going through sustained periods of urbanisation.
Economic growth in Asia has slowed considerably since the start of the global financial crisis; reports from China suggest that economic growth has dropped from 11% to 6% during the crisis.
As a result, demand for copper has slowed. However, there is a light at the end of the tunnel. Deutshe Bank head of equities Max Koep reports that copper, along with gold and platinum group metals, will start to regain ground that was lost at the start of the crisis.
This presents Zambia with a unique opportunity to capitalise on increased demand for copper during the course of the year. With beneficiation laws requiring the bulk of ROM ore to be beneficiated locally, Zambia could look forward to a sustained period of economic growth driven by the mining industry.
Zambia, once viewed as a Central African economic power house, wants to reclaim some of its former glory as Africa's biggest greenfield copper project, Lumwana, is commissioned.
As recently as the 1960s, Zambia was the world's biggest producer of copper but its position was usurped by Chile, about which Anglo American CEO Cynthia Carroll said in Santiago this month: "The success of Chile in establishing a stable macro-economic environment and attractive investment climate is the envy of the world."
Zambia needs to take note of that sort of comment to improve its position as an investment destination and encourage foreign direct investment (FDI) once again.
Zambia's 1964 independence saw the start of its FDI decline, which reached a crisis point in the 1990s. All the while, Chile had been allowed to streak ahead as plans to develop Zambia's mineral-rich North West province, which forms part of the renowned African Copper Belt and houses massive copper deposits, gathered dust.
The boom saw mines reopen, but now mine closure is on more investors lips than mine openers, Glencore, for one seeking to close its Nkana and Mufulira copper mines.
But the exception the Australian-led Equinox Minerals, which flew journalists to its big Lumwana copper mine opening last week.
Equinox CEO Craig Williams said at the opening that the company he cofounded came into Zambia looking for a project that would enhance its stability, and to gain a foothold into Africa.
But sobering was his comment that no fewer than ten companies had previously tried to develop the Lumwana project - which has both copper and uranium - but fell short owing to lack of funding and changes in mining policy in the country.
The Lumwana licence covers 1 355 km2 and includes two major copper deposits, Malundwe and Chimiwungo, as well as 25 exploration prospects, and comes into play when at a time when major producer Codelco foresees the 2010 copper at $1,50/lb - or $3,300/t.
Fairfax reports that the current lower copper prices are still well above production costs for many of the better quality miners.
Catalyst for Change
Zambian President Rupiah Banda made his mark at the Lumwana opening, marvelling at the irony of the Lumwana project being commissioned while the world is still suffering in the aftermath the financial meltdown.
Fairfax mining analysis service expects Lumwana to produce 172 000t of copper a year for the first five years.
"The opening of the Lumwana copper mine will be a catalyst for change in Zambia. It will be the economic turning point that the North Western province and Zambia needs to re-establish itself as a Central African economic powerhouse," Banda predicted.
But to do so, the Zambian government will have to show consistency and ongoing credibility, which has been lacking in the past.
The manner in which Zambia cut, raised and then recut its mining royalty regime turned potential investors away.
While Banda called for others to show the perseverance that Equinox has shown at Lumwana, it would be in Zambia's interests to note that its copper rival, Chile, last month received a credit upgrade from Moody's Investors Service along with a positive outlook at a time when most other countries are receiving downgrades from the same institution.
"As a nation, we need to take up a mindset of perseverance because when challenges look formidable, we can mobilise ourselves and resolutely confront our challenges in order to realise that which others think is insurmountable," said Banda.
He added that the second lesson that could be learned from the development of the project was that success does not come easily, as during the period of planning and developing the Lumwana project, a lot of money was spent on developing associated infrastructure.
"I am informed that, in the 12 years of the development of the Lumwana project, Equinox invested more than $1-billion, which included the development of a modern new town in Lumwana," said Banda
Banda praised the dedication of the former Zambian President Patrick Mwanawasa, describing the late president's commitment to the development of the project as unwavering. He assured Equinox that the current Zambian government would display similar commitment.
"The current Zambian government and the people of this country will support this investment and stand by Equinox to ensure that the Lumwana project is beneficial for all stakeholders," said Banda.
Funding Lumwana today would probably have been an extremely tough task. But Equinox began doing so in a far better capital-raising environment, and Lumwana's uranium upside assisted.
In 2006, Equinox completed three rounds of equity financing totalling $250-million through a short-form prospectus equity issue managed by an international syndicate of underwriters; a private placement equity issue to Zambia Consolidated Copper Mines Investments Holdings, managed by the company; and a second short-form prospectus equity issue, managed by an international syndicate of underwriters. Equinox also announced recently that it has agreed the restructure of its credit facilities.
The company completed a uranium feasibility study in 2008 which showed output of two million pounds a year of uranium oxide and 15 000 t of copper that could be mined simultaneously from the discrete uranium-enriched zones in the Lumwana copper pits.
In May 2008 Equinox Minerals was also able to secure a 99-year land title to 350 km2 for its township and mine operation areas.
The licence is valid for 25 years, from January 2004, and is renewable for a further 25 years.
Production from the copper plant is expected towards the end of the middle of the second quarter while commissioning of the uranium plant is targeted for 2010.
Copper wise, so much hinges on demand.
Fairfax remains cautious about fundamental demand in China being enough to absorb all additional copper imported and produced recently, but says that, if the global stimulus packages result in stronger, sustained demand then there is reason for optimism. The London investment analysts see the US stimulus package in particular as having the potential to cause American copper demand to recover.
Diversified engineering companies Bateman Engineering NV and Ausenco were responsible for the building of the process plant.
Sulphide ore will be processed on-site by conventional flotation methods to produce copper concentrates for shipment to off-site smelters.
Concentrates will then be smelted and refined into metal at smelters either in Zambia, southern Africa or offshore. Negotiations are under way with a number of regional smelters, with letters of intent having been signed with Palabora Mining Company in South Africa, Ongopolo Mining and Processing in Namibia and Mopani Copper Mines in Zambia.
Trucks from the mine will tip directly into a 400 t capacity run of mine (ROM) dump hopper. A primary gyratory crusher will be used to crush the ROM ore from a nominal top size of 1 500 mm to less than 200 mm. Oversize material will be deposited on the ROM pad to be further broken by a mobile rock breaker.
Ore will be reclaimed through apron feeders onto a conveyor belt providing direct feed, at a rate of about 2 500t/h, into the SAG mill. The SAG mill trommel undersize will discharge into a hopper and will be pumped to conventional hydrocyclones, operating in closed circuit with a 26-ft × 40-ft ball mill. The hydrocyclone overflow reports to flotation, while the underflow returns to the ball mill.
The flotation plant will consist of two parallel trains of rougher scavenger cells. The rougher scavenger concentrate will report to the regrind circuit to further liberate the copper minerals. Regrinding will be followed by a conventional cleaner and recleaner circuit to reach final concentrate grade.
The concentrate will be dewatered in a circuit consisting of high-rate thickening followed by pressure filtration to produce a filter cake suitable for transportation. Flotation tailings will be thickened and pumped to the tailings dam. Most of the plant water will be recovered and recycled from the thickener overflows and tailings dam return water. Fresh make-up water will be supplied as required from a river-water dam.
The Lumwana project is situated in Zambia's North West province, which is predominantly rural. Instead of importing mine workers from developed centres such as Kitwe and Lusaka, Equinox, in conjunction with the Lumwana Mining Company (LMC), have established a comprehensive social upliftment programme, which aims to develop the immediate area surrounding the mine as well as neighbouring Solwezi.
Former Zambian politician, now chairperson of LMC Dr Peter Matoka reported that the Lumwana social upliftment programme was unlike any in Central Africa.
"Various projects are being driven by mine bosses to build schools and libraries in Lumwana and Solwezi. Programmes are also in place to ensure that the best teachers are employed in the schools surrounding Solwezi. Ultimately, the programme wishes to encourage the advancement of literacy in the rural North Western province," says Matoka.
Government is also playing a role in the development of the area. Matoka reports that the Zambian government has made significant donations to the establishment of clinics and hospitals in the area.
And the fruits of the social upliftment programme are already starting to show; a feature of the Lumwana mine is the huge Euclid DT 50 t dump trucks that transport the crushed ore to the process plant. The majority of these trucks are operated by workers from the Solwezi district and are predominantly female.
Construction of the mine started in earnest in late 2006 and has been carried out by about 4 700 local workers, and cost about $760-million.
Matoka said that skills retention in the area is key, especially since the mine's expected to produce its first tonnages towards the end of the second quarter.
"There have been some enquiries to tap into the mine's skills base especially from mines in neighbouring countries. The majority of the enquiry's are centred on the mine's truck operators," says Matoka.
The demand for copper over the past two years has been high; this was mainly driven by demand from China and India, both going through sustained periods of urbanisation.
Economic growth in Asia has slowed considerably since the start of the global financial crisis; reports from China suggest that economic growth has dropped from 11% to 6% during the crisis.
As a result, demand for copper has slowed. However, there is a light at the end of the tunnel. Deutshe Bank head of equities Max Koep reports that copper, along with gold and platinum group metals, will start to regain ground that was lost at the start of the crisis.
This presents Zambia with a unique opportunity to capitalise on increased demand for copper during the course of the year. With beneficiation laws requiring the bulk of ROM ore to be beneficiated locally, Zambia could look forward to a sustained period of economic growth driven by the mining industry.
Subscribe to:
Posts (Atom)